Small for hyperscale use but strong for vendors, contractors, edge infrastructure or support operations.
Fiber onsite; electric onsite; water well; close to Hyperion.
Power configuration makes this a priority Nuclear Landman listing. Exact available deliverable MW and utility study status should be confirmed.
Two substations onsite; transformer capacity disclosed in listing; six available breakers; approximately two miles from I-95.
Power, water, fiber and entitlement should be confirmed before representing as infrastructure-ready.
Direct data-center adjacency; large acreage; established industrial growth corridor.
Suitable for a single-user campus or phased industrial/data center development, subject to utility-capacity confirmation.
Industrial zoning; water; sewer; power; dual-road access; signalized intersection; regional I-20 access.
Likely better for support-sector development unless utility upgrades support high-density loads.
Strong industrial adjacency and transportation access.
Smaller site, but strong for ancillary infrastructure or specialized high-load use subject to utility confirmation.
Major power line along frontage road; substation nearby; more than 1,200 feet of I-77 frontage.
Requires validation of power capacity, fiber and commercial entitlement before data-center marketing.
Water and power access reported; low acquisition basis; significant regional development activity.
Speculative development land. Zoning change, utility capacity and infrastructure must be verified.
Low basis per acre; proximity to data center growth; major proposed roadway infrastructure.
Speculative: power, water, fiber, zoning conversion and environmental constraints require full diligence.
Large low-cost acreage near emerging industrial growth.