One of the strongest large-campus opportunities in the dataset. Verify exact industrial acreage, entitlements and utility capacity.
APS grid power adjacent; Southwest Gas adjacent; Arizona Water adjacent; Cox fiber within 0.5 mile; large contiguous acreage.
Strong water/power characteristics. Industrial entitlement and deliverable power require confirmation.
Onsite power infrastructure; 1,700+ GPM well; adjacency to water district; flat development conditions.
Excellent ancillary/support-services location. Large hyperscale suitability depends on power and parcel configuration.
Utilities available; I-24 access; immediate proximity to major industrial employers and Google data center.
Strong ancillary industrial/commercial opportunity. Direct site power, water, fiber and zoning need verification.
Immediate proximity to one of the country’s largest AI infrastructure developments.
Small for hyperscale use but strong for vendors, contractors, edge infrastructure or support operations.
Fiber onsite; electric onsite; water well; close to Hyperion.
Power configuration makes this a priority Nuclear Landman listing. Exact available deliverable MW and utility study status should be confirmed.
Two substations onsite; transformer capacity disclosed in listing; six available breakers; approximately two miles from I-95.