Approximately 624 acres marketed as a major industrial or data center redevelopment site with unusually strong existing utility and logistics infrastructure.
Infrastructure & Utilities
Power Available
115 kV transmission line to site; 230 kV line immediately adjacent; Duke Energy
Substation Distance
N/A
Transmission Voltage
N/A
Fiber Availability
Not publicly s
Water Source
Freshwater pond storage and river intake systems
Cooling Type
N/A
Site Highlights & Diligence Notes
Site Highlights
115 kV line to site; 230 kV adjacent; CSX rail; freshwater storage; river intake; gas pipelines; nitrogen pipeline; water/waste treatment infrastructure.
Developer Notes
One of the strongest data-center-oriented land offerings found. Pricing is undisclosed and all utility capacity should be confirmed directly.